朱卫兵,王晓振,谢建林,赵波智,宁杉,许家林.矿山采动覆岩内部岩移原位监测技术进展及应用,2023,2023年09期:1-12,12
朱卫兵.大采高开采高位关键层运动致灾机理研究,2023,2023年01期:1-6,6
Ning, Shan,Lou, Jinfu,Wang, Laolao,余丹,朱卫兵.Stability Influencing Factors and Control Methods of Residual Coal Pillars with Solid Waste Materials Backfilling Method,2022,卷: 12期: 10
Ning, Shan,朱卫兵,谢建林,Song, Shikang,王晓振,余丹,Lou, Jinfu,许家林.Influence of stress distribution in coal seams of non-uniform extremely thick key stratum and disaster-causing mechanisms,2022,卷: 12期: 1
余丹,Yi, Xiaoyong,Liang, Zhimeng,Lou, Jinfu,朱卫兵.Research on Strong Ground Pressure of Multiple-Seam Caused by Remnant Room Pillars Undermining in Shallow Seams,2021,卷: 14期: 17
李竹,冯国瑞,朱卫兵,宁杉.柱式采空区蹬空复采充填体高-强协调机制及其临界高度研究,2021,2021年03期:469-478,10
Xu, Jingmin,朱卫兵,许家林,吴疆宇,Li, Yingchun.High-intensity longwall mining-induced ground subsidence in Shendong coalfield, China,2021,卷: 141
Ning, Shan,朱卫兵,Yi, Xiaoyong,Wang, Laolao.Evolution Law of Floor Fracture Zone above a Confined Aquifer Using Backfill Replacement Mining Technology,2021,卷: 2021
Yi, Xiaoyong,朱卫兵,Ning, Shan,Wang, Laolao,Luo, Zeqiang.Critical Height of Unfilled Zone in Underlying Gob Piles,2021,v 2021,
Yu, Shengchao,Xu, Jingmin,朱卫兵,王思华,Liu, Wenbing.Development of a combined mining technique to protect the underground workspace above confined aquifer from water inrush disaster,2020,v 79,n 7,p3649-3666
朱卫兵,于斌,鞠金峰,刘文兵,齐祥瑞.采场顶板关键层“横U-Y”型周期破断特征的试验研究,2019,2020年02期:36-43,8
刘文兵,徐敬民,朱卫兵,王思华.A novel short‐wall caving zone backfilling technique for controlling mining subsidence,2019