Xu, Jingmin,朱卫兵,许家林,吴疆宇,Li, Yingchun.High-intensity longwall mining-induced ground subsidence in Shendong coalfield, China,2021,卷: 141
Ning, Shan,朱卫兵,Yi, Xiaoyong,Wang, Laolao.Evolution Law of Floor Fracture Zone above a Confined Aquifer Using Backfill Replacement Mining Technology,2021,卷: 2021
Yi, Xiaoyong,朱卫兵,Ning, Shan,Wang, Laolao,Luo, Zeqiang.Critical Height of Unfilled Zone in Underlying Gob Piles,2021,v 2021,
Yu, Shengchao,Xu, Jingmin,朱卫兵,王思华,Liu, Wenbing.Development of a combined mining technique to protect the underground workspace above confined aquifer from water inrush disaster,2020,v 79,n 7,p3649-3666
Yu, Shengchao,Xu, Jingmin,朱卫兵,王思华,Liu, Wenbing.Development of a combined mining technique to protect the underground workspace above confined aquifer from water inrush disaster,2020,v 79,n 7,p3649-3666
朱卫兵,于斌,鞠金峰,刘文兵,齐祥瑞.采场顶板关键层“横U-Y”型周期破断特征的试验研究,2019,2020年02期:36-43,8
刘文兵,徐敬民,朱卫兵,王思华.A novel short‐wall caving zone backfilling technique for controlling mining subsidence,2019
Kuang, Tiejun,李珠,朱卫兵,谢建林,鞠金峰,Liu, Jinrong,Xu, Jingmin.The impact of key strata movement on ground pressure behaviour in the Datong coalfield,2019,v 119,p193-204
朱卫兵,Qi, Xiangrui,鞠金峰,Xu, Jingmin.Mechanisms behind strong strata behaviour in high longwall mining face-ends under shallow covers,2019,卷: 16期: 3页: 559-570
朱卫兵,陈璐,周子龙,Baotang Shen,Yun Xu.Failure propagation of pillars and roof in a room and pillar mine induced by longwall mining in the lower seam,2019
朱卫兵,许家林,陈璐,李竹,刘文涛.浅埋近距离煤层开采房式煤柱群动态失稳致灾机制,2019
朱卫兵,许家林.Experimental study on excavating strip coal pillars using caving zone backfill technology,2018,11;554;
