- [1] 李小林,司佳佳,尹传传,李玉鹏.考虑工件释放时间和柔性维护的单机调度问题,2023,29(2)
- [2] 李小林,李玉鹏,黄艳利.Heuristics and lower bound for minimizing maximum lateness on a batch processing machine with incompatible job families,2019,卷: 106页: 91-101
- [3] 李小林.Scheduling Batch Processing Machine Using Max-Min Ant System Algorithm Improved by a Local Search Method,2018,2018;1;
- [4] 李小林.Minimising makespan on a batch processing machine using heuristics improved by an enumeration scheme,2017,55;1;
- [5] 李小林.考虑分时电价的多目标批调度问题蚁群算法求解,2014,22;12;56-64
- [6] 李小林,黄艳利.Scheduling unrelated parallel batch processing machines with non-identical job sizes,2013,40;12;2983-2990
- [7] 李小林.Heuristics to schedule uniform parallel batch processing machines with dynamic job arrivals,2013,26;5;
|