- 袁振民.耦合协调度视角下装配式建筑精益施工能力与效益关系评估研究.2022,2022年09期:2540-2550,11
- yuanzhenmin.Cause Analysis of Hindering On-Site Lean Construction for Prefabricated Buildings and Corresponding Organizational Capability Evaluation.2020
- yuanzhenmin.Research on Lean Planning and Optimization for Precast Component Production Based on Discrete Event Simulation.2020
- 张子垚.The quality traceability system for prefabricated buildings using blockchain: An integrated framework.2020
- yuanzhenmin.Research on the Barrier Analysis and Strength Measurement of a Prefabricated Building Design.2020