-
[1] 地层沉降协调法防治煤矿立井破坏试验研究[J].工程地质学报
-
[2] Numerical simulation of rock breaking by TBM disc cutter in soil-rock composite formations.Bulletin of Engineering Geology and the Environment
-
[3] Experimental Study on Influence of Additional Stress Induced by Hydrophobic Drainage on Vertical Shaft-Lining.Mining, Metallurgy & Exploration
-
[4] 于庆,贺虎,张卫强,乔伟.混合式岩体力学全英文课程的探索与应用,2024,2024年08期:95-99,5
-
[5] Research on Durability Evolution of Concrete in Sulfuric Acid Corrosion Environment[J].Journal of Failure Analysis and Prevention,2024,24(2):685–699
-
[6] 于庆,苗浩禹,林明华,何晓宏,董青红.Research on Durability Evolution of Concrete in Sulfuric Acid Corrosion Environment,2024,v 24,n 2,p685-699
-
[7] 于庆,苗浩禹,何晓宏,林明华,郭蕊,张凯翔.Experimental Study on Influence of Additional Stress Induced by Hydrophobic Drainage on Vertical Shaft-Lining,2023,v 40,n 2,p667-689
-
[8] 于庆,苗浩禹,何晓宏,林明华,郭蕊,张凯翔.Experimental Study on Influence of Additional Stress Induced by Hydrophobic Drainage on Vertical Shaft-Lining,2023,40(2):667-689
-
[9] 于庆,He, Xiaohong,Miao, Haoyu,Lin, Minghua,Zhang, Kaixiang,Guo, Rui.Numerical simulation of rock breaking by TBM disc cutter in soil-rock composite formations,2022,v 81,n 12,
-
[10] 周鑫,于庆.地层沉降协调法防治煤矿立井破坏试验研究,2021,2021年04期:1105-1112,8