Paper Publications
- Cheng He,Zhang, Dongbin,Liao, Shuo,Shao, Dali,胡义华.Integrated Drive Converter of SDS-SRM With Isolation and Nonisolation Charging Capabilities for Electric Vehicle,2022,卷: 69期: 9页: 8679-8691
- Cheng He,Sun, Shilong,Zhou, Xueqian,Shao, Dali,Mi, Shuai,胡义华.Sensorless DPCC of PMLSM Using SOGI-PLL-Based High-Order SMO with Cogging Force Feedforward Compensation,2022,v 8,n 1,p1094-1104
- Cheng He,Liao, Shuo,yanwenju.Development and Performance Analysis of Segmented-Double-Stator Switched Reluctance Machine,2022,卷: 69期: 2页: 1298-1309
- Cheng He,Sun, Junhang,Wang, Zelu,Liu, Yingying.Current Optimization Control of Switched Reluctance Motor for Low Speed Range,2022,v 50,n 9-10,p538-548
- Cheng He,Wang, Wuhui,Liu, Hailong,Yang, Shiyang.Integrated multifunctional power converter for small electric vehicles,2021,v 21,n 11,p1633-1645
- Shui, Hengqi,于东升,Yu, Shenglong,Iu, Herbert H. C.,Fernando, Tyrone,程鹤.An Autonomous Impedance Adaptation Strategy for Wireless Power Transfer System Using Phase-Controlled Switched Capacitors,2021,卷: 9期: 2页: 2303-2316
- Cheng He,Mi, Shuai,Wang, Zelu,Shao, Dali,Wu, Haonan,闫文举,yudongsheng.Phase Current Reconstruction With Dual-Sensor for Switched Reluctance Motor Drive System,2021,卷: 9页: 114095-114103
- Cheng He,Wang, Lunjun,Xu, Lei,Ge, Xudong,Yang, Shiyang.An integrated electrified powertrain topology with SRG and SRM for plug-in hybrid electrical vehicle,2020,v 67,n 10,p8231-8241
- Cheng He,Wang, Zelu,Yang, Shiyang,黄劲,Ge, Xudong.An Integrated SRM Powertrain Topology for Plug-In Hybrid Electric Vehicles With Multiple Driving and Onboard Charging Capabilities,2020,卷: 6期: 2页: 578-591
- Cheng He,Ge, Xudong,Wang, Lunjun,Xu, Lei.Four-Quadrant Sensorless Operation of Switched Reluctance Machine over the Wide Speed Range,2020,v 48,n 1-2,p224-240
Address:No1,Daxue Road,Xuzhou,Jiangsu,221116,P.R.China Email: master@cumt.edu.cn
All Rights Reserved by China University of Mining and Technology