Multi-period planning of integrated underground logistics system network for automated construction-demolition-municipal waste collection and parcel delivery: A case study
点击次数:
DOI码:10.19940/j.cnki.1008-0422.2021.02.032
项目来源:自选课题
第一作者:仲昭通
合写作者:张潇,林祖锐
论文类型:期刊论文
论文编号:5b5bb2947da3abfc017db1fd748e3553
卷号::190-193,4
ISSN号:1008-0422
是否译文:否
发表时间:2021-02-28